Stale answer — last reviewed 12 months ago
This entry exceeds the 12-month freshness policy. A solutions engineer must either request admin refresh OR proceed with override + reason before reusing it on an RFP.
Answer
Canonical answer maintained by the knowledge admin. Used by AI drafting to seed RFP draft v1.
Yes — current EU SCCs (2021 versions) are signed as part of the DPA. Transfer Impact Assessments performed for any data transfers outside the EEA / UK / adequacy regions.
Used by drafts (1)
RFP questions that drafted from this library entry.
- Q-2031-C09Schrems II — Standard Contractual Clauses?